Areca ARC-1882LP Manuel d'utilisateur Page 162

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 197
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 161
APPENDIX
162
B-4 Installation
1. Make sure all power to the system is disconnected.
2. The 6Gb/s SAS RAID controller’s battery connector is available
for the optional battery backup module. Connect the BBM cable to
the 12-pin battery connector on the controller.
3. Integrators may provide pre-drilled holes in their cabinet for
securing the BBM using its three mounting positions.
4. Low prole bracket also provided.
5. The BBM will occupy one PCI slot on the host backplane.
B-5 Battery Backup Capacity
Battery backup capacity is dened as the maximum duration of a
power failure for which data in the cache memory can be main-
tained by the battery. The BBM’s backup capacity varied with the
memory chips that installed on the 6Gb/s SAS RAID controller.
B-6 Operation
1. Battery conditioning is automatic. There are no manual proce-
dures for battery conditioning or preconditioning to be performed
by the user.
Vue de la page 161
1 2 ... 157 158 159 160 161 162 163 164 165 166 167 ... 196 197

Commentaires sur ces manuels

Pas de commentaire